AFME-EM-02 Engineering Shift Handover Log

A structured handover between engineering shifts, so open isolations, temporary repairs, breakdowns and parts on order are never lost between shifts. Poor handovers are a common factor in incidents and repeated breakdowns: an isolation left in place, a temporary repair nobody knows about, or a part on order that the next shift chases again. A short, structured handover takes ten minutes and protects people, product and production.

Category: Engineering Management Type: Form Discipline: Engineering Management, Health & Safety, Maintenance & Reliability Format: PDF

What is included

• Cover page with document control (code, revision, date)
• How to use this resource, who it is for and related legislation and standards
• Shift handover log
• Printable A4 PDF in the AFME house format; forms and registers ready to print and fill in

Who this resource is for

Shift engineers, engineering supervisors and team leaders.

How to use this resource

1. Complete the log during the last hour of the shift.
2. Hand over face to face where possible, walking the critical items on the floor.
3. The incoming engineer reads, asks questions and signs to accept the handover.
4. Safety items (isolations, permits, defeated or faulty safety devices) are always discussed first.
5. Keep logs for at least 12 months; review them for repeat issues.